TxDOT Headquarters

Austin, TX
121,700sf+

Completed in 2022, the new 49-acre TxDOT Headquarters is home to over 2000 agency employees.  Construction included 5 structures comprising of an office building, a parking structure, materials lab, and a print shop.  Detec’s TruGround Conductive Primer was installed below the PVC roof membrane, enabling ELD testing.  Detec Systems performed IntegriScan testing, locating an average of 1 breach for every 900sqft tested.  Most breaches were due to trade damage.

Interested in learning more about Electronic Leak Detection testing and monitoring? Call 855.75.DETEC (855-753-3832).

IT'S A GAME CHANGER!
A new patented formulation that enables what was, until now, not possible: 
A truly reliable membrane integrity test for conventional membrane assemblies!

TruGround is the only approved/conclusive method to perform membrane integrity testing on conventional roofs. Stop playing games with other testing methods. Spec the one that works. Fast. Affordable. Reliable. Who says you can't have it all?